ADU construction from the footing up

A backyard unit or a garage conversion starts with what it stands on. We plan the foundation, the framing and the utility runs, then build the unit.

Tell us about the house

We read every request and answer by phone or email with the next step. How we use your details.

To send, add your first name and a phone number or an email.

A new foundation for a detached unit

A detached ADU needs its own footing or slab, sized to the soil and the design. The engineer sets the depth and reinforcement, and we form, place and inspect the concrete before framing starts.

Converting a garage

Many garage slabs were poured without the footings a living space needs. We check the slab edge, the existing footing and the wall framing. Where they fall short, the plans add new footing sections, sill bolts and shear walls before the room is finished.

From plans to keys

The plans package covers the drawings the permit needs. After approval we frame, rough in plumbing and electrical, insulate, close the walls and finish the unit, with an inspection at each stage the permit sets.

ADU Construction: questions

Plan the ADU from the ground up

Send the form with your lot and what you want to build. We review it and send the next step in writing.