ADU Construction in Hermosa Beach

Hermosa Beach ADUs with stainless and hot-dip galvanized connectors, rebar kept deep in dense concrete and wall cladding that stands up to salty air.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Type 316 stainless steel is our pick for the hold-downs and straps on a Hermosa Beach ADU, because salt in coastal air works into plain and lightly coated steel until a connector loses section. Those connectors tie each braced wall to the foundation, so their condition is the condition of the seismic load path. Where a part is not made in stainless, hot-dip galvanized steel with matching fasteners is used.

Concrete and steel below grade

Reinforcing bar rusts when moisture and chloride reach it, and rust swells enough to crack the concrete around it. In a Hermosa Beach footing we keep the bar up on chairs so concrete covers it fully on every side, and the mix uses less water so it cures dense. Anchor bolts that pass from the concrete into the sill plate get the same corrosion-resistant finish as the hold-downs above. A vapor retarder under the slab keeps ground moisture from rising into the floor.

Cladding and openings

For the walls, a drainage plane goes on first, then fiber cement or cement plaster, both of which hold up without rotting. Window frames are vinyl or fiberglass, which outlast bare aluminum near the water. Flashing at each opening is lapped so water runs outward. Nails into siding and trim are stainless, since a rusting nail head stains the face and loosens over time. Each choice is also checked against the engineer's lateral design, because the cladding goes over the sheathing that braces the unit.

About our adu construction serviceEverything we do in Hermosa Beach

ADU Construction in Hermosa Beach: questions

Book an inspection in Hermosa Beach

Describe the house and what it needs. We look at the structure first and send the quote in writing.