Room Additions in Downey With Water Kept Out

Room additions in Downey detailed to keep water away from new framing: clearances, flashing and grading, with footings by Aspenwell Construction.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Wood that touches damp soil begins to fail where nobody is looking. The simplest way to keep water out of a Downey addition is to leave a clear gap between finished ground and the bottom of the siding, and to keep the sill plate well above the dirt. Details at the roof joint and around every opening finish the job, and each one is drawn before framing starts.

Ground contact and clearances

Building code asks for the bottom of wood siding to sit a set distance above exposed soil, and for the sill plate to be treated lumber if it is near the ground. We build to that and a little beyond, setting the foundation top high enough that planters and walkways can slope away without burying the wall. Where a patio or path meets the new room, it should fall away from the house. A strip of gravel or a small drain along the wall gives roof runoff somewhere to go. The footing drawing shows the intended finish height so the builders can match it.

Roof joint and openings

The most leak-prone spot on any addition is where the new roof runs into the old wall or roof. Step flashing woven with the shingles, a kickout at the bottom and a sealed top edge keep water on the surface. Windows and doors get membrane under the frame and flashing over it, lapped in the order water would run. Inland sun and dry wind age caulk first, so joints rely on metal and lapped membrane, with sealant as the backup. Downey's building department inspects these details at the framing stage.

About our room additions serviceEverything we do in Downey

Room Additions in Downey: questions

Book an inspection in Downey

Describe the house and what it needs. We look at the structure first and send the quote in writing.