Room Additions in Winnetka

Winnetka room additions drawn so LADBS can follow seismic force from the new roof and floor into braced walls, with inspections run footing first.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Collector straps and roof sheathing nailing get a careful read when LADBS reviews a Winnetka addition. During an earthquake, the roof and floor act like flat plates that gather sideways force and hand it to the braced walls. If the new plate is not connected to the old one along the joint, the two halves can pull apart. The plans have to show that connection piece by piece.

Following the force across the joint

The reviewer checks that blocking runs along the seam where new and old roof framing meet, that sheathing is nailed to it at the spacing the engineer set, and that metal straps carry force from the new roof into an existing braced wall. At floor level, the same idea applies to the ledger and the rim. Every one of those parts needs a callout with a size and a fastener schedule, and missing ones come back as corrections. The calculations sheet has to agree with every one of them.

Inspections in the order they happen

On site, the footing trench and its steel are inspected first, before concrete is placed. Framing comes next, and shear panels, straps and hold-downs are checked while still exposed. Rough plumbing, wiring and ducts pass their own inspections, and the frame inspection is made once those are approved. An insulation inspection comes next, and drywall waits for it, since covered walls cannot be checked. The engineer's details guide each step, and our written quote prices any upgrade to the existing structure as a separate line.

About our room additions serviceEverything we do in Winnetka

Room Additions in Winnetka: questions

Book an inspection in Winnetka

Describe the house and what it needs. We look at the structure first and send the quote in writing.