Full Home Remodeling in Oak Park
Oak Park whole-house remodels that begin with gas capped and circuits shut off, then demolition, structure, systems and finishes. Aspenwell Construction.
The gas line gets capped and the circuits feeding the work area get shut off before a single wall opens in an Oak Park remodel. Water lines to rooms being gutted are valved off too. With live services out of the way, demolition can expose the frame safely, and the structural repairs that follow have clear access to the floor, the walls and the attic.
What follows the shutoffs
Demolition removes only what the approved plans name, and finished rooms staying in use are sealed off with plastic and taped seams. Foundation repair, anchor bolts and cripple wall bracing come next, each inspected before it is covered. Framing for the new layout follows, then plumbing, wiring and ducts are run through the open walls and inspected along with the framing. Temporary power keeps tools running throughout, so the house panel can be replaced or relocated when the plans call for it without stopping the work.
Permits and the exterior
Oak Park is unincorporated, which puts the permit with the Ventura County building department. Fire hazard maps reach into Oak Park, so a parcel there may call for ember-resistant vents, noncombustible soffits, tempered glazing and a Class A roof. Those materials are chosen before framing, because they shape details at the eaves and openings. The quote groups structural, exterior and finish work separately, so any fire items the review confirms appear as their own section. If the review finds the lot outside a mapped zone, that section simply drops away.
About our full home remodeling serviceEverything we do in Oak Park
Full Home Remodeling in Oak Park: questions
A bearing wall comes out after its beam is sized, posts are located and footings are ready below. Partitions with nothing resting on them are simpler, once utilities inside them are shut off and rerouted. The survey sorts every wall, and none is removed before the approved plans name it.
During, right after demolition and before the new framing. Anchor bolts, cripple wall panels and hold-downs go in while the base of the house is bare and are inspected before anything covers them. The retrofit appears as a separate item in the quote.
We record how the footings and foundation look, whether the sill is bolted, the state of the cripple walls and joists, and the rafters or trusses overhead. We also note where the gas, water and electrical lines run, since those decide the shutoff plan. The designer receives that list ahead of any layout.
Full Home Remodeling in other cities
More we build in Oak Park
Book an inspection in Oak Park
Describe the house and what it needs. We look at the structure first and send the quote in writing.