Full Home Remodeling in Torrance

Torrance whole-house remodels start with a string line on the footing and a plumb line on the wall. Aspenwell Construction, Long Beach.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

A chalk line snapped along the stem wall shows whether a foundation has held its shape. A plumb bob dropped from the top plate shows whether a wall leans. These are the first measurements we take on a Torrance house, because they say whether the frame is straight enough to build on or needs correcting before a new layout depends on it.

Reading the foundation

From a string line we can see dips and bulges along the footing. A hairline crack in the stem wall is common and usually cosmetic, while a stepped crack with a displaced edge points to movement. We map each crack with a pencil and a ruler, and photograph it. The sill and the floor above are checked against the same line. A frame sitting on a footing that has shifted can be shimmed and strapped, or the footing section is repaired, depending on what the engineer decides.

Walls that lean

A plumb bob along a wall reads true or off. An out-of-plumb wall can be pulled straight with bracing before sheathing is nailed, but only if we know before the finish arrives. Bolting the sill to the foundation and adding hold-downs ties these walls back to the base. If the lot sits in a coastal zone, the building department will also look at whether coastal rules apply. Corrections found by the survey are listed in the quote as separate items.

About our full home remodeling serviceEverything we do in Torrance

Full Home Remodeling in Torrance: questions

Book an inspection in Torrance

Describe the house and what it needs. We look at the structure first and send the quote in writing.