ADU Construction in Encino

Encino ADUs, with a plain answer on whether to bolt down the main house while the backyard unit is designed and built. Aspenwell Construction.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

"Should the house get bolted down while the unit goes up?" For an Encino lot the short answer is that a detached ADU does not depend on it, because the new building stands on its own footings. Pairing the two can still make sense. The engineer is already drawing, a crew is already on site, and a retrofit of the old house can share the same design visit and permit review.

What a retrofit of the main house adds

On a raised house, the work is anchor bolts through the sill into the old foundation and plywood on the cripple walls, the short framed walls that lift the floor off the foundation. A house on a slab may need only bolts or straps at certain walls. We crawl under, measure cripple wall heights and count existing bolts before saying which applies. The retrofit gets its own sheet and its own inspection, so it can be set aside later if the budget for the unit needs room.

When the unit joins the house

An attached unit changes the question. LADBS plan check wants to know how the new walls tie into the old ones and whether the old framing can carry what that connection asks of it. Sometimes the engineer separates the two with a gap so each moves on its own in a quake. Other times the old wall gets new plywood, new hold-downs and a deeper footing where it meets the addition. We open that wall at a test spot before the set is drawn, so the design starts from what is really there.

About our adu construction serviceEverything we do in Encino

ADU Construction in Encino: questions

Book an inspection in Encino

Describe the house and what it needs. We look at the structure first and send the quote in writing.