Full Home Remodeling in Encino With Open Rooms
Encino whole-house remodels where a bearing wall gives way to an engineered beam, posts and footings, shored and inspected before the ceiling closes.
"Will the floor upstairs dip when the kitchen wall comes out?" Asked on the first walk-through of an Encino house, that question has a structural answer. If the wall carries the floor above, an engineer sizes a beam to pick up those joists, carried down to the soil by posts and their own footings. Built that way, the opening stays flat and the doors upstairs keep closing as they did before.
Proving what the wall carries
We check the wall from both sides of the floor it holds. Upstairs or in the attic, joists or rafters that land on its top plate show it is bearing. Under the floor, a footing or a girder beneath it confirms the path to the ground. The engineer uses those findings to size the beam and decide whether it hangs below the ceiling or sits flush within the joists, which takes a hanger on every joist that meets it. Encino is in the City of Los Angeles, and LADBS reviews those calculations before the permit is issued.
How the opening is built
Temporary walls go up on both sides of the old one to hold the floor while it comes out. If the existing foundation cannot take the post loads, new footings are dug and poured first. Posts and the beam are set, the joists are tied in with hangers or bear on top, and the shoring stays until every connector is installed. An inspector sees the beam, posts and hardware before the ceiling is closed. The finished opening should show no sag, and doors above it should swing and latch as before.
About our full home remodeling serviceEverything we do in Encino
Full Home Remodeling in Encino: questions
Partitions bearing nothing come out with patching and some rerouting of wires or pipes. A wall holding joists can come out too, once a beam, posts and footings are engineered for its load. Shear walls differ, because they brace the house against sideways shaking, so moving one means adding bracing somewhere else on the plan.
During, and early. When the remodel opens the floor and lower walls, the crawlspace is reachable and the sill is in view, which makes bolting and bracing simpler than at any later point. The work shares the remodel's permit and is inspected bare, before flooring and drywall go back over it.
Everything that holds the house up: footings and any cracks in them, the sill and its bolts, crawlspace walls, girders and joists, bearing walls and the roof framing. We also note sagging floors and doors that bind. The designer and engineer use that record to plan openings the structure can carry.