Pacoima ADUs placed around the sewer lateral, the electrical panel and the gas meter, with footings that sit on undisturbed soil clear of every trench.
Gravity sets the first rule for a Pacoima ADU: its drains must fall into the sewer lateral that leaves the main house. So we find where that pipe exits, how deep it runs and which way it falls toward the street. No footing may bear on top of it either, which means the unit's position and its foundation trench are set around the lateral's path before anything else.
Reading the lateral with a camera
A camera fed through the cleanout shows the pipe material, any root intrusion or offset joints, and the depth at each fitting. If the run sits too shallow for the unit's drains to fall into it, a sewage ejector pump joins the design, and that changes where the bathroom goes. Cracked clay pipe under the planned slab is replaced before concrete, since a repair under a finished floor means cutting it open. The plumbing layout then shows the new connection point and the cleanouts LADBS requires on the line.
Panel, gas and the footing layout
Whether the main panel can feed a second dwelling comes from a load calculation, and an upgrade, if needed, may relocate the meter. Across the yard, the feeder trench must not undercut the new footing or the house foundation. A gas line, if the unit gets one, follows its own trench with the clearance the code sets. With all three paths drawn, the unit lands where its foundation sits on undisturbed soil and every service reaches it cleanly. That placement is fixed before the engineer sizes a single footing.
About our adu construction serviceEverything we do in Pacoima
ADU Construction in Pacoima: questions
Usually a reinforced concrete slab with a perimeter footing, with the drain lines set in place before the pour. If the yard has soft fill or slopes, the engineer may switch to a raised floor on a stem wall, which leaves room to reach the plumbing later. Both are anchored to the framing above with bolts and hold-downs.
The answer sits in the existing footing's measurements. We dig beside one wall to see its depth and look for reinforcing steel. A footing that meets the engineer's requirements can stay, with new anchors and shear walls added. One that falls short gets new sections under the bearing walls. The new bathroom drain is also cut into the slab.
The package covers a single-story Pacoima ADU of up to 500 square feet, detached or made from a garage. A bigger plan or a two-story unit is priced after we see the lot. For a garage conversion of qualifying size, the floor plan carries the drain and fixture layout that the sewer reading decides.
ADU Construction in other cities
More we build in Pacoima
Book an inspection in Pacoima
Describe the house and what it needs. We look at the structure first and send the quote in writing.