Claremont Room Additions, built in the right order

A Claremont home addition runs in a set order, with the old exterior wall coming out last. Footings, framing and roof come first. Aspenwell Construction.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

The old exterior wall of a Claremont house is the last piece to come out. Before that, plans are approved, underground lines are marked, footings are dug, poured and left to gain strength, and the new frame goes up beside the house with a roof on top. Opening the wall late keeps rain and dust out of the living space for as long as possible.

Ground first, then frame

Footings are the first real work. They are formed, reinforced with steel and inspected before concrete arrives, then given days to cure so they can carry load. The floor system and walls follow, built to the engineer's drawings with straps and hold-downs set as the plans call. The roof is next, and it is covered with underlayment right away. Until that roof is dried in, the existing house stays closed and untouched, and the people living in it keep their rooms.

Opening the old wall

Only when the new shell is roofed does the connection get cut. The existing wall is opened to the width of the doorway, shored where it carries load, and a header or beam is set across. Wiring and plumbing inside that wall are rerouted and tested before they are closed. Finishes then run in one direction: insulation, drywall, trim and paint last, so the seam disappears into the rest of the house and the final inspection has nothing left to open.

About our room additions serviceEverything we do in Claremont

Room Additions in Claremont: questions

Book an inspection in Claremont

Describe the house and what it needs. We look at the structure first and send the quote in writing.