Covina Room Additions, planned around what is in the wall

Covina home additions begin by finding what hides in the connecting wall: pipes, gas, cable and framing. Aspenwell Construction plans around it.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

The wall chosen as the connection to a Covina addition is rarely empty. A drain stack, a gas line or a bundle of cable may run through it, and nobody drew them. We find these before the design is final, since moving a door a short distance to clear a vent stack costs nothing on paper and a good deal once framing has begun.

Looking before cutting

A stud finder, a thin camera and a few small inspection holes tell us what the connecting wall holds. Plumbing vents, supply lines and cable runs get traced to their start and end. Whatever sits where the opening will be is either rerouted or the opening is shifted. Framing inside the wall gets read too, because a missing or undersized header over an old window changes how the new beam must be carried, and the plans have to say so.

When a find changes the plan

A drain that crosses the footprint may force the new footing to bridge it with a sleeve. A gas line in the way is capped and rerouted by a licensed trade before the wall opens. If the old framing is thinner than the plans assume, the engineer revises the connection. These changes show up on paper before work starts, so the sequence on site stays orderly and the inspector sees the final detail drawn. The reviewer sees one clean detail.

About our room additions serviceEverything we do in Covina

Room Additions in Covina: questions

Book an inspection in Covina

Describe the house and what it needs. We look at the structure first and send the quote in writing.