Full Home Remodeling in Covina
Covina whole-house remodeling that looks for girder splices with no post under the joint and adds support before any wall above them is opened up.
A girder splice left floating between posts works like a hinge under a Covina house, and the floor above it sags toward the joint. It stays hidden until someone crawls the full length of the girder with a light. Finding one adds a post and a concrete pad to the scope, and it can change which wall above may come out, since that wall may be helping hold the floor up.
Fixing the splice before opening walls
The repair starts with a temporary jack and a short beam under the girder on each side of the joint. The floor is raised slowly to level, a pad is poured, and a new post with metal connectors goes under the splice. A weak splice may get a bolted side plate or a new girder section on the engineer's sheet. Only after that support is in place can a wall above be opened, because the beam that replaces it needs a firm girder or footing at each end. Working in this order keeps new cracks out of finished walls.
How the finding shapes the layout
A wall sitting right over a weak splice deserves a second look before the plan removes it. Once the new post is in, the girder can carry the end of a beam from a widened opening, and the designer can place that opening with the post in mind. If the post would land where a crawlspace access needs to stay clear, the engineer can lengthen the girder repair to shift it. Ceiling height, floor flatness and door clearances in the finished rooms all follow from where that support ends up, so it is all settled in the drawings ahead of framing.
About our full home remodeling serviceEverything we do in Covina
Full Home Remodeling in Covina: questions
Partitions with nothing on them come out once the crawlspace and attic confirm it. A bearing wall can be replaced with a beam, provided each beam end lands on solid support. If a girder under that wall has a floating splice, the new post goes in first, then the opening is framed.
Treat girder and post repairs as step one, then add anchor bolts and cripple wall plywood in the same crawlspace phase. With the floor level and the frame tied down, the remodel framing above can proceed. Everything shares a permit and a schedule.
We crawl every girder end to end and check each splice for a post, then the sill bolts, cripple walls and joists. Above the floor, bearing walls are traced to the attic. Floor readings show where sag lines up with a splice. The designer gets the findings in writing with a marked sketch.
Full Home Remodeling in other cities
More we build in Covina
Book an inspection in Covina
Describe the house and what it needs. We look at the structure first and send the quote in writing.

