Structural Work in Santa Monica
Santa Monica retrofits start with the metal: corroded straps, nail plates and bolts get tested, then bracing, anchors and beams are drawn.
Salt carried in coastal air can settle on bare steel under the floor. Straps, nail plates and bolt heads may lose much of their thickness while the wood around them looks fine. In Santa Monica we tap, scrape and probe the metal as well as the sill, because a corroded connection counts as no connection at all. Finding one changes the hardware list and sometimes the sill itself.
Metal gets graded too
Surface rust is scraped back to bare steel to see what thickness remains. A hold-down or strap that has lost section is replaced, and the new hardware is hot-dip galvanized or stainless where the plans call for it. Nails matter as much as the plates, since a corroded nail shears early. We also check the wood where steel touched it, because damp hardware can stain and soften the fibers around the fastener. Findings are listed hardware item by hardware item so the replacement count is visible in the written scope.
Permit and the coastal zone
The lot may or may not sit in the coastal zone, a point that can change what the city reviews, so it gets confirmed with the Santa Monica building department before drawings are final. A standard bolt and brace scope follows the code's published pattern. Heavier scopes bring in an engineer. Inspections happen while the framing is open, and replacement hardware is listed by type so the inspector can match it on site. The quote carries the drawings, permit and inspection as lines of their own.
About our structural work serviceEverything we do in Santa Monica
Structural Work in Santa Monica: questions
Either can be missing, and corroded hardware can make a house look anchored when it is not. The visit tests the metal, the sill and the short walls, and the quote lists the pieces that need work, one hardware item at a time.
The code's published retrofit pattern can serve a plain job. Beams, steel frames and rebuilt foundations get an engineer's calculations, arranged through us. The finished sheets go to the Santa Monica building department for review before work begins.
The metal and the sill. We scrape rust to see what remains, probe the wood and count anchors. Short walls, girder supports and moisture follow. Corroded fasteners are counted as well. Everything is written up with the scope.
Structural Work in other cities
More we build in Santa Monica
Book an inspection in Santa Monica
Describe the house and what it needs. We look at the structure first and send the quote in writing.