ADU Construction in Malibu

Malibu ADUs built on footings the soils report sizes, with a planned route for concrete and steel to the back of the lot and fire-ready details.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Wet concrete is the load that tests the route to the back of a Malibu lot, because footings cannot wait while a truck backs out and tries another angle. We walk the path from the street with the pour in mind, measure gates and turns, and decide early whether a line pump will carry the mix through a hose. Rebar cages, anchor bolts and hold-down hardware follow that same path a day or so ahead.

Footings matched to the ground

The soils report sets the depth and width of every footing for a Malibu ADU, and the engineer works from it to resist both the weight of the unit and the sideways push of an earthquake. On firm soil a continuous footing with a slab may be enough. On softer or fill ground the design can move to drilled piers tied by grade beams. If the lot slopes, the downhill footings get deeper so the floor stays level. We place anchor bolts at the spacing shown, then call for the inspection before any concrete arrives.

Septic, salt air and the review

If the lot runs on a septic system, the tank and its leach field limit where the unit can stand, and a new bedroom may change what the system has to handle. The City of Malibu reviews the plans, and a parcel may or may not need a coastal approval as well. Some Malibu lots carry a fire hazard mapping, and there the set adds ember-resistant vents and a Class A roof. Connectors exposed to salt-laden air are stainless or heavily galvanized, which keeps the load path sound over the long run.

About our adu construction serviceEverything we do in Malibu