Structural Work in Inglewood

Inglewood soft-story retrofits in their true order: design and permit, a grade beam that cures, then a steel frame tied to the floor above.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Steel cannot go up in an Inglewood garage opening until the footing under it has gained strength. That single dependency sets the order of a soft-story retrofit. The engineer's design and the permit come first, then the slab is saw-cut and a grade beam is dug and poured. Only after the concrete cures does the moment frame arrive, get set on its anchor rods and bolt at the top to the floor above.

Ground first, steel second

Before the saw touches the slab, the space is cleared and any pipes or conduit crossing the footing line are located, since a buried drain can force the trench to shift. The trench is cut to the engineer's depth, reinforcing bars and anchor rods are tied in place, and the city inspector checks that cage while it is open. Concrete then fills the trench and is kept damp as it cures. Rushing this stage would leave anchor rods in concrete too green to hold the base plates at full load.

Frame, connections, closing up

The moment frame is lifted in, plumbed and leveled, and its base plates are grouted tight to the new footing. At the top, bolts and straps tie the frame into the floor framing through a new collector, so load from the rooms upstairs has a path down. Plywood shear walls may be added along the sides of the opening. The inspector returns before ceilings or wall finishes cover anything. Inglewood's building and safety staff review the full set before any of this begins, and the quote lists each stage.

About our structural work serviceEverything we do in Inglewood

Structural Work in Inglewood: questions

Book an inspection in Inglewood

Describe the house and what it needs. We look at the structure first and send the quote in writing.