ADU Construction in Inglewood
Inglewood ADUs planned around the way in: gate width, the side yard and how footing concrete reaches the back of the lot. Aspenwell Construction.
A line pump parked at the curb, with hose laid along the side yard, is how footing concrete gets to the back of an Inglewood lot when no mixer truck can pass the house. Rebar, anchor bolts and framing lumber follow the same narrow path by hand or on a small cart. So before the unit is placed on paper, we measure that route from the street to the spot where the slab will sit.
Measuring the way in
Gate width, the clear height under eaves and overhead lines, and any meter, condenser or hose bib sticking out from a wall all set what can move along the side of the house. A route that narrows to a body's width means panels framed small and carried in, and footing steel tied in place in the trench. Where the driveway reaches the back, its slab is checked for cracks and covered with plywood and mats before any loaded cart rolls over it, so the house keeps the driveway it had.
Protecting what is already in the ground
The sewer line from the house, water and gas branches, and the main house footing can all lie close to the delivery path. We locate them before heavy loads cross, and we keep the pump hose and any trenching clear of them. Soil dug out for the new footings leaves the same way the materials came in, in bags or a compact loader, so the route stays usable for the whole build. The City of Inglewood inspects the footings, and the trench has to be clean and dry for that visit.
About our adu construction serviceEverything we do in Inglewood
ADU Construction in Inglewood: questions
Typically a slab-on-grade, steel-reinforced, with its edges dug deeper to serve as the footing for the walls. The engineer sizes it from the soil and the bracing layout. Because the concrete may arrive by pump hose, the mix and the pour sequence are planned around that before the trench is dug.
Some can, if the walls already rest on a footing the engineer can count on. Others sit on little more than the slab, and the walls that will brace the new room need concrete poured under them. A converted garage also skips the delivery puzzle of a backyard unit, since the shell is already standing.
Units of a single story and no more than 500 square feet, in detached, attached or garage form. For an Inglewood lot the site plan has to show the unit, the setbacks and the access path clearly, and the city reads it closely for all three. Bigger or two-story units are priced separately.
ADU Construction in other cities
More we build in Inglewood
Book an inspection in Inglewood
Describe the house and what it needs. We look at the structure first and send the quote in writing.

