ADU Construction in Valley Village, Starting With the Soil

Valley Village ADUs that start with a soil test at the footing line, then setbacks, separation and grade measured before any foundation is designed.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Our hand auger goes into a Valley Village yard first, turning up soil from where a new footing would bear. How easily it turns, and what comes up, tells us whether the unit will rest on firm native ground or on loose fill. We bore at each corner of the proposed footprint and near the main house, then decide with the engineer whether a soils report is needed before the foundation is designed.

What the auger can and cannot tell

An auger boring is a field check. It shows soft spots, buried debris and changes in fill depth across the footprint, which can point to an old pool, a removed tree or a backfilled trench. Where it finds any of those, a geotechnical engineer drills or digs test pits and reports bearing capacity and soil expansion. The foundation design follows that report, and LADBS reviews the footing sizes against it. A clean boring on every corner lets the engineer work from code values with more confidence.

Measuring the rest of the lot

After the soil, we tape the distances that fix where the unit can go: side and rear property lines, the gap to the main house, and the working room the footing trench and its forms need. A level run across the footprint shows whether the yard falls from one end to the other, which sets whether one side of the slab needs a deeper edge. Trees close to the footprint get noted, since roots can lift a slab or crack a footing. All of it goes onto the site plan we draw for the permit.

About our adu construction serviceEverything we do in Valley Village

ADU Construction in Valley Village: questions

Book an inspection in Valley Village

Describe the house and what it needs. We look at the structure first and send the quote in writing.