Full Home Remodeling in Woodland Hills
Woodland Hills whole-house remodels that send roof water away from the stem wall, dry the crawlspace and protect the sill before new framing goes in.
Water that collects against a stem wall slowly works on the parts a seismic retrofit depends on, the mudsill, its anchor bolts and the foot of any short wall under the floor. Before a Woodland Hills remodel closes up, we trace where each downspout empties and how the soil falls next to the foundation. Flashing goes in where siding meets concrete, and roof water leaves in solid pipe. A dry crawlspace keeps old and new framing sound.
Keeping the crawlspace dry while walls are open
A crawlspace that stays damp shows it in the wood. We probe the sill and the bottom of the floor joists with an awl, and a soft spot tells us water has been getting in for some time. The fix starts outside. Each roof outlet joins a buried line that discharges well clear of the footing, and soil piled against the house is cut back until it sits below the weep screed. Inside, a vapor barrier covers bare earth and the vents stay open so the space can breathe. Only then does the retrofit hardware go on.
Openings in the wall and the flashing behind them
Every new window or wider door in a Woodland Hills exterior wall is a fresh path for water. Each rough opening gets a sloped sill pan before the unit is set, with side and head flashing lapped so water always steps outward. Where a beam goes over a wider opening, the header and its posts sit inside a wrapped wall, so moisture never reaches the steel connectors that tie them down. A new exterior door gets a threshold pan too. Sealant dries and splits under hard sun, so the flashing is lapped to shed water without relying on it.
About our full home remodeling serviceEverything we do in Woodland Hills
Full Home Remodeling in Woodland Hills: questions
Partitions that carry nothing above them can go with little more than rerouted wiring and pipes. A bearing wall can go too once the engineer specifies a beam, posts sized for its ends and a footing under each post. For a Woodland Hills house we confirm which is which from the attic and the crawlspace before the layout is final.
During, as an early phase. Once the floors and lower walls of a Woodland Hills house are open, bolting the sill and bracing the short walls under the floor takes far less effort than a separate visit later. We schedule that work ahead of new framing, so the new layout is built on a house already tied to its foundation.
It starts at the footing and climbs. We look for cracks and settlement in the concrete, check whether the house is bolted down, read moisture in the wood near grade and trace each load from the roof to the ground. For a Woodland Hills remodel, that report shows the designer what can change and what needs repair first.
Full Home Remodeling in other cities
More we build in Woodland Hills
Book an inspection in Woodland Hills
Describe the house and what it needs. We look at the structure first and send the quote in writing.