Full Home Remodeling in West Hills
West Hills whole-house remodels that open the floor early, find hidden framing and footing problems and price each repair before the layout is set.
A post resting on a loose brick under a West Hills floor can stay unseen until the subfloor comes up, and finding it changes the plan for the room above. That post may be holding the girder a new kitchen island will sit over. Once the floor is open we replace such supports with concrete piers and metal post bases, then the engineer decides whether the layout needs a heavier girder. Surprises found early cost the schedule far less.
What opening the floor can turn up
Past repairs hide under many floors. A joist notched deep for a drain line, a girder spliced away from any post, or a footing crack filled with mortar can all sit out of sight. When we find one in a West Hills house, it goes into the survey with a photo and a note on what it supports. The engineer then sizes the fix, whether a sister joist, a new post under the splice or a fresh footing section, and the written quote lists it as its own line beside the remodel work.
Pipes and wiring inside walls slated to go
A wall marked for removal can hide a vent stack, a gas line or a junction box, and each one decides how and when that wall goes. A vent stack needs a new route to the roof before demolition. A gas line gets capped and rerun. Older wiring found spliced inside the cavity is replaced back to the panel. In a West Hills house that rough work gets an LADBS inspection before insulation, so we locate these runs early and draw them into the plan.
About our full home remodeling serviceEverything we do in West Hills
Full Home Remodeling in West Hills: questions
Any wall can move with the right support, though the work differs a great deal. One carrying no load needs only its wiring and plumbing rerouted. Removing one that bears load brings in an engineered beam, with posts and fresh footings under its ends. For a West Hills house we confirm which kind each wall is by tracing joists and rafters before the designer commits.
Alongside demolition and ahead of finish work is the timing that fits best. With the subfloor of a West Hills house open, the sill can be bolted and the short walls braced from above where the crawlspace is tight. Waiting until later means reopening finished floors or working on your back under the house.
The survey reads the house from top to bottom. In the attic we note how rafters bear and where loads land. Underneath a West Hills floor we check the concrete for cracks, test the wood for rot and look for missing bolts. It ends with a marked plan showing bearing lines and the repairs that come first.
Full Home Remodeling in other cities
More we build in West Hills
Book an inspection in West Hills
Describe the house and what it needs. We look at the structure first and send the quote in writing.

