Bathroom Remodeling in Long Beach

Long Beach bathroom remodels built on repaired joists, stainless hangers and a glued plywood subfloor, with the shower pan flood tested before tile.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Stainless steel joist hangers and structural screws hold the repaired floor framing under a Long Beach bathroom together, because shower steam from above and, on a coastal lot, damp salty air in the crawlspace below will rust bright steel until a connection loosens. We choose that hardware before any tile. A floor that flexes cracks grout and tears membranes, so the joists, their hangers and the subfloor are settled first, and the finish goes on a frame that stays still.

Joists, bored holes and the drain line

With the old floor cut away around the tub and toilet, each joist end and bearing point gets probed with an awl. Soft wood is sistered full length or replaced, and new exterior-grade plywood is glued and screwed over it. A new drain normally passes through a hole bored near the middle of the joist depth, kept within the size the code allows and clear of the top and bottom edges. If an earlier plumber notched a joist deeper than the code permits, that member gets a full-length sister or a header to carry it, sized by an engineer when the cut is severe. Solid blocking spreads the weight of a heavy tub.

Rough inspection with the walls open

Relocating a drain, adding a circuit or changing the fan duct brings a bathroom under a permit from the City of Long Beach. Its inspectors come at rough-in, when pipes, wires and framing can all be seen, and again at the end. They look for vent lines that tie in correctly, ground-fault protection near water, a fan ducted to the outdoors and safety glass beside the tub. Between those visits the shower pan is flood tested, and the result is photographed for the file. Drywall and backer board go up only after the rough sign-off.

About our bathroom remodeling serviceEverything we do in Long Beach

Bathroom Remodeling in Long Beach: questions

Book an inspection in Long Beach

Describe the house and what it needs. We look at the structure first and send the quote in writing.