Room Additions in Long Beach

Ground-floor suite additions in Long Beach by Aspenwell Construction, framed level with the house so a bedroom and shower work without a step.

Tell us about the house

By sending, you agree Aspenwell Construction may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

From bed to shower with no step, no tight turn and no door that fights back: that is how a ground-floor suite in a Long Beach addition should work, and the ease begins in the structure. The new floor is framed level with the old one, and on a raised floor the shower area is dropped within the joists so its tile meets the bathroom floor without a curb.

Level floors and a curbless shower

Matching floor heights starts with measuring the old floor at the wall that will open. The new joists or slab are set to that line, and the threshold gets a flush transition. For a curbless shower on a raised floor, the engineer details joists in that area set lower or sized deeper, with blocking and hangers to carry the change. On a slab, the concrete is recessed where the shower sits. A wider doorway with a beam over it leaves room for a walker or a wheelchair, now or later.

Walls ready for a grab bar

Solid blocking between studs around the toilet, the shower and the bed wall lets grab bars go in later without opening the wall. Switches sit at a reachable height and outlets are raised a little off the floor. Plan review happens at the City of Long Beach, and whether coastal permit rules reach a particular lot is confirmed before filing. Inspectors check the framing, the blocking and the shower pan before the walls are closed, and the beam over the wide doorway is checked with them.

About our room additions serviceEverything we do in Long Beach

Room Additions in Long Beach: questions

Book an inspection in Long Beach

Describe the house and what it needs. We look at the structure first and send the quote in writing.